Installing a Libusun stone and wood facade
Libusun panels install as a dry trade — no mortar, no curing — at up to 500 sq ft per day for a two-person crew. This guide covers both the adhered and rainscreen clip-rail systems, from substrate preparation through finishing.
- 1
Prepare the substrate
Confirm the substrate is clean, flat, dry, and structurally sound. Libusun installs over cement board, plywood, CMU, and — for interior work — drywall. Address moisture, movement, and planarity issues before starting.
- 2
Set out the layout
Establish control lines and dry-fit panels before bonding. Pull panels from multiple boxes at once to blend the natural stone variation and avoid clustering similar tones. Plan corners and terminations from the detail library.
- 3
Choose the fixing system
For adhered installation, apply construction adhesive per the data sheet and press each panel home with even pressure. For rainscreen installation, mount the stainless clip-rail to the structure, then hang and lock panels onto the rail over a drained, ventilated cavity.
- 4
Cut and fit
Cut panels on site with a standard wet saw or angle grinder. The flexible backing lets panels wrap columns and curves where solid stone cannot. Maintain consistent joints using the recommended spacers.
- 5
Finish and clean
Terminate edges and corners with the matching profiles. Clean the finished surface with a soft brush and mild detergent. Avoid abrasive cleaners and high-pressure washers.



